Solar in Florida

Florida investor-owned utilities net meter under rule 25-6.065. The federal residential clean energy credit does not apply to an installation completed after December 31, 2025. Price the system without that credit.

Rows of blue solar panels under a bright sky with scattered clouds.
Photo from Pexels. Source. Pexels License. Commercial use allowed.

Florida conditions

Florida is a hot, humid, hurricane-exposed state. South Florida is not the same design problem as the Panhandle or inland Central Florida. Wind, rain, and flood maps change by address.

The Florida Building Code is statewide. The 8th Edition (2023) took effect December 31, 2023. The Commission's workplan sets the 9th Edition (2026) effective date at December 31, 2026. The High Velocity Hurricane Zone is Miami-Dade and Broward. Other counties use the wind-borne debris map instead.

When a roof is a solar candidate

The useful questions are shade, the direction and condition of the roof, the electrical panel, and what the utility pays for exported power. A roof that needs replacement in the next few years should be replaced first. Taking an array off later to reroof is a second project.

Panels, inverters, and batteries

Rows of blue solar panels under a bright sky with scattered clouds.
Photo from Pexels. Source. Pexels License. Commercial use allowed.

The Department of Energy's 2025 benchmark models a representative home system as 20 monofacial modules of 400 watts, each paired with a microinverter, for 8 kWdc and about 7 kWac. That is one common layout, not the only one. A string inverter with optimizers is the other usual choice. Microinverters keep one shaded module from dragging down the rest. A string inverter is simpler and has one box to service.

A battery does not make the panels cheaper. The same benchmark prices an 8 kWdc system with 13.5 kWh of storage at $4.59 per watt dc as a modeled market price, against $2.95 per watt dc for the panels alone. Those figures are 2024 dollars, leave out subsidies to the owner, and are models rather than quotes. Buy a battery if you want backup during an outage or if the utility's export credit is poor. Do not buy one because a sales sheet calls it standard.

Published cost ranges

The U.S. Department of Energy's 2025 first-quarter benchmark, stated in 2024 dollars, models an 8 kWdc home system without batteries at $2.78 per watt dc (minimum sustainable price) and $2.95 per watt dc (modeled market price). Multiplying $2.95 by 8,000 watts is about $23,600 before any subsidy paid to the owner. The same benchmark with 13.5 kWh of storage is $4.59 per watt dc as a modeled market price. The Department describes these as models, not quotes, and says owner subsidies are left out.

We do not publish a city or county average. Doing that without a public local source would be a guess.

What the schedule is made of

A solar job usually runs measure, product choice, permit, order, install, then inspection. The long part is often the permit review and the factory lead time, not the day of installation. This page does not print a number of weeks, because lead times and building departments differ and a made-up range would be a guess.

Credits and programs

The IRS says the Energy Efficient Home Improvement Credit is not allowed for property placed in service after December 31, 2025. Through that date the credit was 30 percent, with annual caps that included $600 for windows and skylights and $2,000 for heat pumps. Those caps are history, not a 2026 discount. The Residential Clean Energy Credit is not allowed for expenditures made after December 31, 2025. The IRS treats that expenditure as made when the original installation is completed, so a 2025 deposit does not keep the credit for a system finished in 2026. This is a reading of IRS pages, not tax advice.

Florida Administrative Code rule 25-6.065 requires investor-owned utilities to net meter customer-owned renewable generation. Extra energy in a billing cycle credits the next cycle, credits can roll for up to 12 months, and unused credits are paid at the utility's as-available energy tariff. You still pay the customer charge and any demand charge. Municipal utilities and electric cooperatives are outside that Public Service Commission rule.

How to compare companies

Florida license records are public at the Department of Business and Professional Regulation. Look up the license before you pay a deposit. A city may also require a local registration. The state record does not tell you whether the person is available or careful.

A useful quote names the product or equipment model, what is torn out, who pulls the permit, what is excluded, and the payment schedule. A deposit can be reasonable. Paying the entire job before any work starts is a risk you do not have to take. Get two quotes against the same scope and see which assumptions differ.

  • The license number, and the name it is issued to.
  • Who pulls the permit, and in whose name.
  • What happens if hidden damage shows up.
  • The warranty on the product and the warranty on the labor, as two separate lines.

After the work

Keep the array free of shade from new trees. Have the inverter alarms checked when production drops and the weather does not explain it. Do not pressure-wash panels unless the manufacturer says that is allowed.

Questions

Who permits solar work in Florida?

The local building department. Florida uses a statewide building code, and cities or counties issue the permit. Miami-Dade and Broward are the High Velocity Hurricane Zone. Other counties use the wind-borne debris map.

Are the dollar figures local?

No. They are national published ranges, cited at the bottom of this page. A state multiplier was not invented.