Solar in Broward County, Florida
Solar on a Broward roof has to stay on the roof in an HVHZ wind event. The attachment and the rack are part of the permit. The federal residential clean energy credit does not cover an installation completed after December 31, 2025.

Broward County
Broward County is one of the two High Velocity Hurricane Zone counties in the Florida Building Code. The other is Miami-Dade. Fort Lauderdale, Hollywood, Pembroke Pines, Coral Springs, and the rest of the county share that zone, whether the house is on the beach or inland.
Florida investor-owned utilities net meter customer-owned renewable generation under rule 25-6.065. Extra kilowatt-hours can credit a later month for up to a year, and unused credits are paid at the as-available energy rate. That is not a promise of one-for-one retail credit for every exported kilowatt-hour. FPL is an investor-owned utility. A municipal utility would follow its own tariff.
Get a roof inspection before you put a 25-year system on a 20-year-old roof. Removing panels later to reroof is a second project.
How the cities in this county differ
The array has to stay on an HVHZ roof, whether the house is on Fort Lauderdale beach or in Plantation. Coastal roofs also face salt and, on some lots, a flood rule for the electrical equipment. Get the roof's remaining life in writing before the panels go on. The city, not the county, permits the installation for these addresses.
Fort Lauderdale
Fort Lauderdale runs from the Atlantic beach through the Intracoastal and the New River to inland neighborhoods. The whole city is in the High Velocity Hurricane Zone.
Downtown towers, canal houses, and inland single-family streets share the HVHZ rule and do not share the same flood exposure.
Hollywood
Hollywood has a beach, a broadwalk, the Intracoastal, and inland neighborhoods west of I-95. All of it is in the HVHZ.
Beach blocks and houses west of I-95 can use the same impact rule and still need different flood checks.
Pembroke Pines
Pembroke Pines is inland southwest Broward. Being away from the beach does not remove the High Velocity Hurricane Zone.
A lot of the housing is newer suburban construction with association rules on exterior appearance.
Coral Springs
Coral Springs is a planned inland city in northwest Broward. It is inside the HVHZ because the whole county is.
Master-planned streets often have association standards for windows and roofs on top of the city permit.
Pompano Beach
Pompano Beach includes an oceanfront, the Intracoastal, and inland areas west of I-95. The city permits work inside the city.
Older beach cottages and newer inland houses will not have the same opening sizes. The HVHZ rule still applies to both.
Plantation
Plantation is inland central Broward. It is not on the beach, and it is still in the High Velocity Hurricane Zone.
The housing mix includes established subdivisions and newer infill. Association rules are common and sit beside the permit.
When a roof is a solar candidate
The useful questions are shade, the direction and condition of the roof, the electrical panel, and what the utility pays for exported power. A roof that needs replacement in the next few years should be replaced first. Taking an array off later to reroof is a second project.
Panels, inverters, and batteries

The Department of Energy's 2025 benchmark models a representative home system as 20 monofacial modules of 400 watts, each paired with a microinverter, for 8 kWdc and about 7 kWac. That is one common layout, not the only one. A string inverter with optimizers is the other usual choice. Microinverters keep one shaded module from dragging down the rest. A string inverter is simpler and has one box to service.
A battery does not make the panels cheaper. The same benchmark prices an 8 kWdc system with 13.5 kWh of storage at $4.59 per watt dc as a modeled market price, against $2.95 per watt dc for the panels alone. Those figures are 2024 dollars, leave out subsidies to the owner, and are models rather than quotes. Buy a battery if you want backup during an outage or if the utility's export credit is poor. Do not buy one because a sales sheet calls it standard.
Permits and inspections
Most building permits in Broward are issued by the city, not by the county. The county building division permits the Broward Municipal Services District and Fort Lauderdale International Airport, and it handles regional elevator work. The Board of Rules and Appeals hears code appeals and interpretations. It does not pull your permit for you.
Florida license records are public through the Department of Business and Professional Regulation. Look up the license before you pay a deposit. A city may also require local registration. The state record does not say whether the company is careful or available.
Look up the address on the FEMA Flood Map Service Center before you change the structure, a water heater location, or electrical equipment. This site does not assign a flood zone.
Published cost ranges
The U.S. Department of Energy's 2025 first-quarter benchmark, stated in 2024 dollars, models an 8 kWdc home system without batteries at $2.78 per watt dc (minimum sustainable price) and $2.95 per watt dc (modeled market price). Multiplying $2.95 by 8,000 watts is about $23,600 before any subsidy paid to the owner. The same benchmark with 13.5 kWh of storage is $4.59 per watt dc as a modeled market price. The Department describes these as models, not quotes, and says owner subsidies are left out.
We do not publish a city or county average. Doing that without a public local source would be a guess.
What the schedule is made of
A solar job usually runs measure, product choice, permit, order, install, then inspection. The long part is often the permit review and the factory lead time, not the day of installation. This page does not print a number of weeks, because lead times and building departments differ and a made-up range would be a guess.
Credits and programs
The IRS says the Energy Efficient Home Improvement Credit is not allowed for property placed in service after December 31, 2025. Through that date the credit was 30 percent, with annual caps that included $600 for windows and skylights and $2,000 for heat pumps. Those caps are history, not a 2026 discount. The Residential Clean Energy Credit is not allowed for expenditures made after December 31, 2025. The IRS treats that expenditure as made when the original installation is completed, so a 2025 deposit does not keep the credit for a system finished in 2026. This is a reading of IRS pages, not tax advice.
Florida Administrative Code rule 25-6.065 requires investor-owned utilities to net meter customer-owned renewable generation. Extra energy in a billing cycle credits the next cycle, credits can roll for up to 12 months, and unused credits are paid at the utility's as-available energy tariff. You still pay the customer charge and any demand charge. Municipal utilities and electric cooperatives are outside that Public Service Commission rule.
How to compare companies
Florida license records are public at the Department of Business and Professional Regulation. Look up the license before you pay a deposit. A city may also require a local registration. The state record does not tell you whether the person is available or careful.
A useful quote names the product or equipment model, what is torn out, who pulls the permit, what is excluded, and the payment schedule. A deposit can be reasonable. Paying the entire job before any work starts is a risk you do not have to take. Get two quotes against the same scope and see which assumptions differ.
- The license number, and the name it is issued to.
- Who pulls the permit, and in whose name.
- What happens if hidden damage shows up.
- The warranty on the product and the warranty on the labor, as two separate lines.
After the work
Keep the array free of shade from new trees. Have the inverter alarms checked when production drops and the weather does not explain it. Do not pressure-wash panels unless the manufacturer says that is allowed.
Questions
Who permits solar work in Broward County?
Most building permits in Broward are issued by the city, not by the county. The county building division permits the Broward Municipal Services District and Fort Lauderdale International Airport, and it handles regional elevator work. The Board of Rules and Appeals hears code appeals and interpretations. It does not pull your permit for you.
Repair or replace solar in Broward County?
Repair when the failure is local and the rest of the system is sound. Replace when the material itself has failed across the house or the permit requires a different product than the one you have.
Sources
- Broward County Building Code Division As of November 21, 2026.
- Broward County Board of Rules and Appeals As of November 21, 2026.
- U.S. Department of Energy, Solar Photovoltaic System Cost Benchmarks (2025 Q1 data, page updated September 2, 2026) As of September 2, 2026.
- IRS, Residential Clean Energy Credit As of November 21, 2026.
- IRS, FAQs on changes to sections 25C and 25D under Public Law 119-21 (July 4, 2025) As of November 21, 2026.
- Florida Administrative Code Rule 25-6.065, net metering As of November 21, 2026.
- Florida Public Service Commission, customer-owned renewable generation overview As of November 21, 2026.
- FEMA Flood Map Service Center As of November 21, 2026.
- Florida Building Commission, code edition notice As of November 21, 2026.