Home remodeling in Florida

A Florida remodel that opens a wall, moves plumbing, or enlarges a window needs a local permit. In the HVHZ, a bigger window also needs impact protection.

A bright kitchen with white cabinets, a large island, and windows along one wall.
Photo from Pexels. Source. Pexels License. Commercial use allowed.

Florida conditions

Florida is a hot, humid, hurricane-exposed state. South Florida is not the same design problem as the Panhandle or inland Central Florida. Wind, rain, and flood maps change by address.

The Florida Building Code is statewide. The 8th Edition (2023) took effect December 31, 2023. The Commission's workplan sets the 9th Edition (2026) effective date at December 31, 2026. The High Velocity Hurricane Zone is Miami-Dade and Broward. Other counties use the wind-borne debris map instead.

Decide the scope before the finishes

A bathroom or kitchen project stays a finish job while the fixtures, cabinets, and appliances stay where they are. It becomes a construction job when a wall, a drain, a gas line, or a window opening moves. Write that down before you price tile.

Bathroom and kitchen scope

A bright kitchen with white cabinets, a large island, and windows along one wall.
Photo from Pexels. Source. Pexels License. Commercial use allowed.

Angi's 2026 bathroom guide splits minor work at $3,000 to $10,000, a partial remodel at $10,000 to $25,000, and a full remodel at $25,000 to $80,000. Most homeowners in that guide pay $6,651 to $17,662, and the average is $12,157. The kitchen guide says most homeowners pay $14,593 to $41,617, with an average of $26,996. The wide ranges are the point. A new faucet and paint are not a new layout.

Keep the toilet, the shower valve, and the sink where they are and you mostly buy finishes and labor. Move them and you buy plumbing, patching, and an inspection. The same is true of a kitchen sink and a range. In South Florida, enlarging a window also pulls the opening-protection rule into the remodel.

Published cost ranges

Angi's 2026 bathroom guide says most homeowners pay $6,651 to $17,662, with a national average of $12,157. It also splits minor work at $3,000 to $10,000, a partial remodel at $10,000 to $25,000, and a full remodel at $25,000 to $80,000.

Angi's 2026 kitchen guide says most homeowners pay $14,593 to $41,617, with a national average of $26,996. Scope and finishes, not the county line, explain most of that spread.

We do not publish a city or county average. Doing that without a public local source would be a guess.

What the schedule is made of

A a remodel job usually runs measure, product choice, permit, order, install, then inspection. The long part is often the permit review and the factory lead time, not the day of installation. This page does not print a number of weeks, because lead times and building departments differ and a made-up range would be a guess.

Credits and programs

The IRS says the Energy Efficient Home Improvement Credit is not allowed for property placed in service after December 31, 2025. Through that date the credit was 30 percent, with annual caps that included $600 for windows and skylights and $2,000 for heat pumps. Those caps are history, not a 2026 discount. The Residential Clean Energy Credit is not allowed for expenditures made after December 31, 2025. The IRS treats that expenditure as made when the original installation is completed, so a 2025 deposit does not keep the credit for a system finished in 2026. This is a reading of IRS pages, not tax advice.

How to compare companies

Florida license records are public at the Department of Business and Professional Regulation. Look up the license before you pay a deposit. A city may also require a local registration. The state record does not tell you whether the person is available or careful.

A useful quote names the product or equipment model, what is torn out, who pulls the permit, what is excluded, and the payment schedule. A deposit can be reasonable. Paying the entire job before any work starts is a risk you do not have to take. Get two quotes against the same scope and see which assumptions differ.

  • The license number, and the name it is issued to.
  • Who pulls the permit, and in whose name.
  • What happens if hidden damage shows up.
  • The warranty on the product and the warranty on the labor, as two separate lines.

After the work

A new bathroom needs a fan that actually exhausts outdoors, and someone has to use it. A new kitchen needs the caulk at the sink kept intact. Those are small habits that protect the work you just paid for.

Questions

Who permits remodeling work in Florida?

The local building department. Florida uses a statewide building code, and cities or counties issue the permit. Miami-Dade and Broward are the High Velocity Hurricane Zone. Other counties use the wind-borne debris map.

Are the dollar figures local?

No. They are national published ranges, cited at the bottom of this page. A state multiplier was not invented.

Sources