Solar in California
The California Public Utilities Commission moved new rooftop solar customers of the large investor-owned utilities onto a net billing tariff. Export credit is not the old one-for-one retail credit. The federal residential credit is also closed for installations completed after December 31, 2025. Read both before you compare bids.

California conditions
California is several climates. Coastal mild, inland valley heat, mountain cold, and wildfire zones can sit a short drive apart. Energy code and fire code both matter more than a single statewide price.
The California Energy Commission publishes the Building Energy Efficiency Standards, often called Title 24. Wildfire hazard zones add ignition-resistant rules for roofs and exterior materials. Ask the local building department whether the address is in a fire hazard severity zone before you pick a roof.
When a roof is a solar candidate
The useful questions are shade, the direction and condition of the roof, the electrical panel, and what the utility pays for exported power. A roof that needs replacement in the next few years should be replaced first. Taking an array off later to reroof is a second project.
Panels, inverters, and batteries

The Department of Energy's 2025 benchmark models a representative home system as 20 monofacial modules of 400 watts, each paired with a microinverter, for 8 kWdc and about 7 kWac. That is one common layout, not the only one. A string inverter with optimizers is the other usual choice. Microinverters keep one shaded module from dragging down the rest. A string inverter is simpler and has one box to service.
A battery does not make the panels cheaper. The same benchmark prices an 8 kWdc system with 13.5 kWh of storage at $4.59 per watt dc as a modeled market price, against $2.95 per watt dc for the panels alone. Those figures are 2024 dollars, leave out subsidies to the owner, and are models rather than quotes. Buy a battery if you want backup during an outage or if the utility's export credit is poor. Do not buy one because a sales sheet calls it standard.
Published cost ranges
The U.S. Department of Energy's 2025 first-quarter benchmark, stated in 2024 dollars, models an 8 kWdc home system without batteries at $2.78 per watt dc (minimum sustainable price) and $2.95 per watt dc (modeled market price). Multiplying $2.95 by 8,000 watts is about $23,600 before any subsidy paid to the owner. The same benchmark with 13.5 kWh of storage is $4.59 per watt dc as a modeled market price. The Department describes these as models, not quotes, and says owner subsidies are left out.
We do not publish a city or county average. Doing that without a public local source would be a guess.
What the schedule is made of
A solar job usually runs measure, product choice, permit, order, install, then inspection. The long part is often the permit review and the factory lead time, not the day of installation. This page does not print a number of weeks, because lead times and building departments differ and a made-up range would be a guess.
Credits and programs
The IRS says the Energy Efficient Home Improvement Credit is not allowed for property placed in service after December 31, 2025. Through that date the credit was 30 percent, with annual caps that included $600 for windows and skylights and $2,000 for heat pumps. Those caps are history, not a 2026 discount. The Residential Clean Energy Credit is not allowed for expenditures made after December 31, 2025. The IRS treats that expenditure as made when the original installation is completed, so a 2025 deposit does not keep the credit for a system finished in 2026. This is a reading of IRS pages, not tax advice.
State and utility rebates change and many are not cited here because we did not verify a current dollar amount. Ask the utility for the tariff that applies now, and do not let a bid depend on a federal credit that has ended.
How to compare companies
California contractors are licensed by the Contractors State License Board. Use the board's license check for the classification that matches the work. A license is not a promise about price or schedule.
A useful quote names the product or equipment model, what is torn out, who pulls the permit, what is excluded, and the payment schedule. A deposit can be reasonable. Paying the entire job before any work starts is a risk you do not have to take. Get two quotes against the same scope and see which assumptions differ.
- The license number, and the name it is issued to.
- Who pulls the permit, and in whose name.
- What happens if hidden damage shows up.
- The warranty on the product and the warranty on the labor, as two separate lines.
After the work
Keep the array free of shade from new trees. Have the inverter alarms checked when production drops and the weather does not explain it. Do not pressure-wash panels unless the manufacturer says that is allowed.
Questions
Who permits solar work in California?
The city or county that enforces the building code for the address. The California Energy Commission publishes the Building Energy Efficiency Standards, often called Title 24. Wildfire hazard zones add ignition-resistant rules for roofs and exterior materials. Ask the local building department whether the address is in a fire hazard severity zone before you pick a roof.
Are the dollar figures local?
No. They are national published ranges, cited at the bottom of this page. A state multiplier was not invented.
Sources
- U.S. Department of Energy, Solar Photovoltaic System Cost Benchmarks (2025 Q1 data, page updated September 2, 2026) As of September 2, 2026.
- IRS, Residential Clean Energy Credit As of November 21, 2026.
- IRS, FAQs on changes to sections 25C and 25D under Public Law 119-21 (July 4, 2025) As of November 21, 2026.
- California Energy Commission, Building Energy Efficiency Standards As of November 21, 2026.
- California Public Utilities Commission, net energy metering As of November 21, 2026.
- California Contractors State License Board, license check As of November 21, 2026.